The Greater Gabbard wind farm is located in the North Sea, 40km east of Harwich.

The wind farm comprises 140 wind turbine generators and associated transmission assets. There are two offshore substation platforms located at separate sites, Inner Gabbard and Galloper.

The substations are connected onshore by three 45km subsea export cables. The onshore cables at 0.6km length connect to the onshore substation at Leiston, near Sizewell.


  • Location:

    Suffolk

  • Owners:

    Equitix Managed Funds

  • Value:

    £317m


  • Offshore Platforms:

    2

  • Produces:

    504MW

  • Powers:

    around 500,000 homes per year

Electricty Cycle

Downloadable Documents

ShareholderS

 

Equitix Managed Funds

Equitix was founded in 2007 as an independent investment vehicle to develop, invest in and manage Public Private Partnership and similar projects primarily in the UK. Through the successful integration of bid leadership, long-term investment and operational experience, Equitix has added value to investments in a wide range of sectors including education, healthcare, social housing, highways maintenance and leisure as well as the Greater Gabbard OFTO project.

____

www.equitix.co.uk


Equitix

Contractors

Operations and Maintenance Services

EDS HV Limited

The shareholder has engaged EDS HV Limited who were founded in 1993 and have been servicing offshore renewables for over a decade.

EDS’s team of multi-skilled engineers and technicians will provide a full turnkey operations and maintenance solution for The Greater Gabbard offshore platforms, the onshore substation and grid connection at the 500MW Greater Gabbard in Lowestoft.

____

https://www.edshv.com/services/services-transmission/


EDS.

Contact Us

Address Company Secretary
c/o Equitix Management Services
3rd Floor (South Building)
200 Aldersgate Street
London
England
EC1A 4HD